Victron Lynx Smart BMS 1000 wiring diagram

Original non-NG M10 Lynx BMS for Victron Lithium Battery Smart: 1000 A contactors, shunt, precharge and Bluetooth. ATC/ATD or supported DVCC control must coordinate chargers and loads; the contactors do not replace external battery and circuit fuses.

Continuous draw
0.4 A
Units

Wiring diagram

How the Lynx Smart 1000 is wired.

Open this example in Crimp to use your own parts and cable lengths. Review the assumptions and installation notes as you adapt the circuit.

Victron Lynx Smart BMS 1000 wiring example with 3 components: Lithium Smart house bank, Lynx Smart 1000, Reference load. 4 cable connections. Crossings are not junctions.Lithium Smart house bank + to Lynx Smart 1000 BATT +: 16 mm² · 25 A fuse, 3 m one way. Lynx Smart 1000 BUS + to Reference load +: 10 mm² · 25 A fuse, 3 m one way. Lithium Smart house bank − to Lynx Smart 1000 BATT −: 16 mm², 3 m one way. Lynx Smart 1000 BUS − to Reference load −: 10 mm², 3 m one wayLithium Smart house bank + to Lynx Smart 1000 BATT +: 16 mm² · 25 A fuse, 3 m one wayLynx Smart 1000 BUS + to Reference load +: 10 mm² · 25 A fuse, 3 m one wayLithium Smart house bank − to Lynx Smart 1000 BATT −: 16 mm², 3 m one wayLynx Smart 1000 BUS − to Reference load −: 10 mm², 3 m one wayVictron LiFePO4 Smart 200Ah. Connect the Lithium Battery Smart BMS leads to the compatible Lynx Smart BMS. These battery control leads are not represented by the power-terminal symbols.Lithium Smart housebank++−−Victron Lynx Smart BMS 1000. DC power paths shown. Connect the matching Lithium Battery Smart BMS harness and use the required ATC/ATD or supported DVCC control to stop chargers and loads before backup contactor protection. Follow the complete BMS installation diagram.Lynx Smart 1000BATT +BATT +BATT −BATT −BUS +BUS +BUS −BUS −12 V reference loadReference load++−−16 mm² · 25 A fuse10 mm² · 25 A fuse16 mm²10 mm²
Victron Lynx Smart BMS 1000 wiring example with 3 components: Lithium Smart house bank, Lynx Smart 1000, Reference load. 4 cable connections. Crossings are not junctions.Red = positive · dark = return · dashed = signal. Wire sizes and fuse ratings are example values; use the equipment instructions and actual installation lengths.
Edit this wiring example

Cable sizing for this example

Use the diagram as a starting point for your installation. Replace the example equipment and cable lengths with your own, and check the connections against your exact model's instructions.

3 m one way

12.8 V system

Wire
16 mm² · 6 AWG
Example fuse
25 A
Design current
18 A
Voltage drop
0.9%

Sized against ABYC E-11. The design current is the part's continuous draw. The length is one way; voltage drop includes an equal-length return.

Run-length and manufacturer assumptions

The editable example uses 3.048 m (10 ft) runs unless a shorter run is stated. Metric overviews round these to 3 m. Adapt the parts and lengths to your installation before choosing cable and protection.

Supporting parts

  1. 6.1 m total of 16 mm² (6 AWG) marine cable
  2. Terminations for 16 mm² cable, matched to the equipment's screw terminals, leads or studs
  3. 25 A fuse and holder on the positive run
  4. Heat-shrink, strain relief and terminal boots sized to the cable

Check stud sizes, fuse type, run length and how warm the space gets against the gear you actually have before you order.

Installation notes

Before you install.

Open a question for model-specific guidance and sources.

Verified against the manufacturer's documentation (rev. rev 18 — 09/2026), checked 2026-10-01. Manufacturer documentation →

Which batteries and hardware match this BMS?

The Lynx Smart BMS 1000 here is the original, non-NG product for Victron Lithium Battery Smart batteries. Lithium NG batteries require the NG BMS family. The original Lynx Smart BMS manual, printed pages 1 and 38–39, identifies the supported family and hardware variants.

The 1000 A version uses M10 module joints and has two internal power contactors. Its current capacity does not make M8 neighbours mechanically compatible.

Where do main power and control connections go?

In the standard configuration, BATT+ / BATT− connect the bank on the left and BUS+ / BUS− connect all loads and chargers on the right. Positive current passes through the contactor and negative current through the shunt. The four studs carry full battery current; the multiconnector does not.

Daisy-chain every battery's BMS cables and connect both remaining ends to the Lynx BMS. Its multiconnector has 13 pins; the manual reserves pins 12 and 13 for future temperature-sensor functionality and says to leave them unconnected. The drawing omits these battery-control connections, VE.Can, RJ10 and the remote on/off loop. A connected power path alone does not establish functioning battery protection.

How should chargers and loads respond?

Use ATC and ATD, or supported DVCC control through a GX device, to stop chargers and loads before a protection event requires the main contactor to open. The contactor is a backup protective action and system switch, not the normal charge regulator.

ATC and ATD are potential-free contacts rated 0.5 A at 60 V DC. The programmable SPDT relay is 2 A at 60 V DC and can provide an alarm or an external alternator-regulator control signal. That contact rating does not authorise routing an alternator's power output or an arbitrary field winding through it. The AUX output supplies battery voltage at up to 1.1 A, with its own shutdown behavior.

What limits and commissioning checks matter?

The contactor rating is 1000 A continuous, with 1200 A for five minutes. This thermal overload allowance is not a fuse interrupt rating. Provide external fuses selected for the cables, bank fault current and equipment; the BMS is not the system fuse. Precharge supports capacitive loads, but the manual requires sufficient load resistance during that phase.

Check detected system voltage, enter correct bank capacity, configure discharge floor and relay function, then verify charger/load shutdown and shunt-current direction. Current M10 connections specify 33 N·m. The manual disagrees about older pre-HQ2340 units' reduced torque; obtain serial-specific confirmation. For an older M8 500 A model, its stated joint torque is 14 N·m.

The standard terminal map does not implement the separate reversed-distribution procedure described in the manual's appendix.

Fit check

Connect it to the rest of your system.

Describe your setup to draft a system with Lynx Smart BMS 1000 connected. Review the selected parts and cable lengths, then edit the diagram in Crimp.

The model only picks parts and draws the connections. Every wire size and fuse rating still comes from Crimp's own sizing, never from the model.

Enable JavaScript to describe your system.

Technical reference

Specifications and terminal map.

Check the model, ratings and connection points against your own unit before choosing installation hardware.

Catalog specification

Original non-NG M10 Lynx BMS for Victron Lithium Battery Smart: 1000 A contactors, shunt, precharge and Bluetooth. ATC/ATD or supported DVCC control must coordinate chargers and loads; the contactors do not replace external battery and circuit fuses.

Continuous draw
0.4 A

Terminal map

Catalog connection points, current direction and planning limits. Check the manufacturer's pinout and connector ratings before installation.

BATT +

positive · input

1000 A

BATT −

negative · input

1000 A

BUS +

positive · output

1000 A

BUS −

negative · output

1000 A
Sources and sizing method

Equipment specifications. Model details, ratings and terminal roles come from the catalog. Check your unit’s label and current manufacturer documentation for its exact revision.

Example sizing. Sized against ABYC E-11. Boats built to UK or EU rules answer to ISO 13297 — check these figures against it before you build. Results use the example current and run length shown above. Set your actual equipment, lengths and installation conditions in Crimp before choosing hardware.

Read how the sizing works

Next step

Plan your installation with Lynx Smart 1000.

Open this example as a new project, or add this component to your existing diagram. Use your equipment and cable lengths to review the sizing.