Overnight
Start full · 100 Ah lithium example
| Constant condition | Net battery draw | Time to reserve |
|---|---|---|
| 10 A loads, no charging | 10 A | 8 hours |
| 20 A loads, no charging | 20 A | 4 hours |
| 10 A loads, 5 A delivered charging | 5 A | 16 hours |
Runtime is the available amp-hours divided by the net discharge current. Net draw means the current the battery must supply after charging has helped with the loads. The 5 A in the last row is current delivered to the same battery bus, not a charger's nameplate rating. If that charging stops, the estimate returns to 8 hours from the same full starting point.
Crimp starts an unset battery at 70% charge. With the same 100 Ah lithium battery and 10 A draw, 70% down to 20% leaves 50 Ah, or about 5 hours. Set the slider to the charge you actually expect before comparing an overnight stop with a full-battery example.
“Time to empty” means time to reserve.
The display estimates when you reach Crimp's planning floor: 20% for lithium or unspecified chemistry, and 50% for AGM, lead-acid or gel. Those defaults are not a battery maker's discharge limit or a BMS cutoff. Reaching reserve does not mean the battery is physically empty; check your battery manual when choosing how much capacity to rely on.
